Collect the shipment inputs
Record what is being shipped and how it is packed. Timber, paperboard, textiles and other moisture-bearing materials can contribute to the load. Include the conditions at stuffing and the time from packing through arrival, storage and unloading.
- Cargo type, quantity and starting moisture condition.
- Pallets, dunnage, cartons and protective packaging.
- Container type and condition, route, season and total duration.
- Sensitive materials and the protection requirement.
Select and calculate the finished units
Use uptake data for the supplied finished unit at relevant temperature, humidity and duration. Include containment, pouch dimensions and the intended installation. BE DRY ULTRA is the BENZ calcium-chloride container family.
A sealed barrier-packed machine or component is assessed as its own enclosure. DIN 55473 and DIN 55474 address bagged desiccants and their application in low-permeability packaging; the whole container needs a cargo-specific moisture assessment.
Container desiccant installation
- Confirm attachment points before loading.
- Check clearance around hanging units so they stay clear of the moving cargo.
A container desiccant strip mounted along the side of a loaded freight container.
Prepare, secure and document the installation
Load goods and packing materials at their required dry condition. Distribute the selected container units according to the installation plan, preserving vapour access and the supplied orientation.
Keep units clear of cargo movement, door operation and locations that could damage the pouch. Record quantity, positions, product lot and packing date so the shipment can be reviewed consistently.
Frequently asked questions
What is container rain?
It is condensation on the container’s inner surfaces that can drip onto cargo when the surfaces cool below the air’s dew point.
Do container desiccants replace VCI film?
Container units manage moisture. VCI film provides corrosion protection around compatible metals in its intended enclosure. Machinery exports can use both within a coordinated packaging plan.
How many desiccants for a 40 foot container?
Determine quantity from the cargo and packing moisture, route, exposure and finished-unit working capacity. Container dimensions are one input to that assessment.
What is the difference between DIN 55473 and DIN 55474?
DIN 55473 specifies bagged desiccant requirements; DIN 55474 covers application and calculation of desiccant units for low-permeability packaging.
Where should desiccants be placed?
Use the supplied product’s installation plan and orientation. Secure units in the intended airspace and protect them from cargo movement and pouch damage.
Can desiccant fix wet cargo already loaded?
Prepare cargo and packing materials at the required dry condition before loading. Review or dry wet materials before sealing; container desiccants are sized for the planned vapour load.