Measure the exit path before designing the pack
Crate and skid dimensions must suit the machine, but they must also clear the available door, aisle, apron and trailer interface. The survey records those dimensions, floor capacity information supplied by the plant, crane or forklift access, and any point where the load must turn. If the complete packed envelope cannot leave safely, the scope identifies an approved equipment split or a different load-out method before timber is ordered.
Press slides, robot arms, machine tables and movable fixtures are placed in their approved transport positions and restrained using manufacturer provisions where available. The packing plan records removed guards, cables and auxiliaries so the receiving team can match each package to the correct asset.
Moisture protection is based on the actual storage and transport plan. Exposed ferrous surfaces may require cleaning and an agreed corrosion-protection system, while control cabinets may need separate dust and moisture controls. Electronics and oily mechanical items are kept apart where their cleanliness requirements conflict.