Base handling marks on verified load data
Fabricated modules and non-uniform machinery require verified weight, centre of gravity, approved lift points and the planned support orientation. These inputs come from drawings, manufacturer information or other accepted project data; they are not estimated from appearance. Skid design and handling marks then follow the confirmed plant, road and terminal stages.
Scale, oil and process residue are assessed before preservation. Cleaning responsibility and acceptance criteria remain subject to the plant procedure, while wrapping begins only after the relevant surfaces and openings are released for packing.
Expected outdoor or covered dwell, cargo format and transport route determine whether a weather-resistant case, sealed barrier, desiccant or VCI system is required. Additional lifts are included only when documented in the handling plan.