Fluids, permits and outdoor time
Equipment from process service may contain product, cleaning media or hydrotest water. Draining, flushing, isolation, gas-free status and blanking are plant-controlled steps governed by permits, EHS procedures and the receiving specification. The packing survey records the approved handover status; internal and external preservation is specified only after the unit is accepted for transport.
Expected pad storage, indoor or outdoor exposure, berth dwell and transport mode are verified before selecting a cover, sealed barrier, desiccant or VCI system. Material compatibility, inspection requirements and the owner's preservation specification control the selection. No product is prescribed solely because the site is in the Eastern Province.
Lift lugs, centre of gravity and plot crane windows are recorded before timber is cut. Licensed lifting, where the plot requires it, is typically arranged by the plant or the project. The packing scope states who is responsible for the pack.