Inspect the existing pack against the next route
For stored or re-export cargo, the first task is to compare the existing pack with the equipment condition and remaining journey. The survey records barrier integrity, visible moisture or contamination, support and restraint, lifting marks, package identification and any opening already made for inspection.
Expected outdoor or covered dwell, destination, transport mode and confirmed terminal handling determine whether the pack can remain closed, needs a controlled repair or requires replacement. A sealed barrier, desiccant, VCI or external weather enclosure is selected from those facts rather than assumed from the Jebel Ali location.
Process residue on equipment from hydrocarbon service is a plant EHS matter. The packing survey records residual-fluid status. Barrier wrapping waits until the interior is transport-safe.
If the lot includes tanks or process skids, each opening is checked against the approved drain, purge and isolation status. Blanks, caps and internal preservation are specified only after the plant releases the equipment as transport-safe.