Verify every handover before finalising the pack
Skids, lifting provisions and restraint points are checked against the verified mass, centre of gravity and handling sequence. Additional terminal lifts or outdoor staging are included only when shown in the carrier or project plan. Container clearance, breakbulk lift arrangements and inspection access can lead to different package divisions.
If cargo arrives already wrapped from an inland plant, the existing pack is assessed against its documented specification, condition and remaining route. Any opening, repair, reinforcement or replacement is agreed before work begins; a packing list alone is not evidence that preservation remains intact.
Preservation for ways, flanges, shafts and electrical assemblies is chosen from actual surface condition, expected duration, exposure and material compatibility. VCI, sealed barrier film and desiccant are used only where the verified protection plan supports them.
Pumps, motors, panels and mill auxiliaries in the same lot each receive their own preparation, preservation, restraint and enclosure specification before the lot is released.