Design the pack around stuffing and handling
The survey records whether the machine will be packed inside a container, loaded as an open-top or flat-rack shipment, or handled under another confirmed booking. Internal dimensions, door clearance, lashing points, lifting method and verified centre of gravity shape the skid and restraint plan.
Expected outdoor staging, covered storage and terminal dwell determine the preservation envelope. Temperature and humidity changes can cause condensation, but a sealed barrier, desiccant, VCI or weather-resistant case is specified only after the equipment sensitivity and documented exposure are assessed.
Where terminal restow or additional handling is confirmed or identified in the approved logistics plan, the skid, lifting arrangement and external marks are designed for those stages. If these stages are not documented, they remain open logistics inputs for the project team.
Electronics, exposed ferrous frames and process skids may share one shipment while requiring different preparation. Clean electrical items are separated from oily or dusty mechanical equipment; process openings are closed only after residual-fluid status is accepted under the plant procedure.