Verify readiness before enclosure
The survey records dimensions, mass, centre of gravity, base and frame geometry, approved lifting and restraint points, moving elements, fluid status, exposed precision surfaces and electrical interfaces. Draining, cleaning, isolation and transport-safe release remain subject to the owner's EHS and equipment procedures.
Long frames and presses are divided and supported only from verified structural information. Axes, rams and other moving parts are secured in manufacturer- or owner-approved positions. Removed connections and assemblies can be match-marked where receiving sequence matters.