Fix the plant and cargo interfaces first
The survey records equipment dimensions, mass, centre of gravity, base and support geometry, approved lifting and restraint points, fluid and cleanliness status, open interfaces and sensitive surfaces. Doorways, aisle turns, floors, docks, cranes and staging areas are checked before package divisions are approved.
The originating plant certifies the drain, clean, isolation and transport-release state under its own EHS and equipment rules. Long frames, rotating equipment, electrical assemblies and vessels are given separate support and preservation methods; moving elements are secured only in approved transport positions.