Measure the exit before fixing the package
The survey records equipment dimensions, mass, centre of gravity, approved lift and restraint points, base geometry, condition, fluids and sensitive surfaces. Doorways, aisle turns, floor capacity, dock height, lifting coverage and staging space are measured before package divisions and assembly order are set.
The Mumbai-region plant confirms drain, cleaning, isolation and transport-release status under its EHS and equipment procedures. Moving elements are secured only in manufacturer- or owner-approved positions. Removed parts can be match-marked and registered for receiving sequence.