Seal the cabinet before timber
Open racks and sensitive assemblies require a defined cleanliness level, closed openings and any customer-specified ESD controls. Timber cutting and dusty fabrication work are separated from exposed equipment where the site procedure requires it. Ferrous frames receive a compatible corrosion-control method only where the assessed exposure supports it.
Whether a sealed barrier, desiccant or VCI system belongs in the pack depends on storage duration, transport mode, equipment sensitivity and the receiving environment. Additional terminal handling is included only when confirmed or documented in the logistics plan.
If the receiving hall has controlled-cleanliness requirements, the enclosure and opening sequence are planned so external timber and wrapping can be removed in the approved area before the protected equipment enters. The customer specification defines acceptable materials and records.