Closed-box air is still wet
Moist air sealed with cold machinery can condense when temperatures change during transit or after arrival. Unpainted ferrous surfaces and ground ways therefore need a preservation decision based on the sailing season, expected terminal dwell, storage conditions and the receiving hall. A sealed barrier and desiccant are specified only where the assessed exposure and customer requirements support them.
Where regulated solid-wood packaging is used for an international shipment into Great Britain, treatment and marking are specified to the destination's applicable ISPM-15 requirements. Processed-wood materials such as plywood, and wood 6 mm or thinner, may be exempt, subject to destination rules and the customer specification. Northern Ireland follows a separate set of wood-packaging rules. Marks that are required have to remain readable after terminal handling. Centre-of-gravity and lifting data must suit the receiving equipment, which may differ from the factory crane at origin.
If the cargo is wrapped at origin, the survey checks whether that system is suitable for the documented transit, dwell and handling plan. Any required barrier closure, monitoring provision or external protection is completed before stuffing.