On-site work, then the route
Teams survey on the plant floor: machine type, lift points, residual fluids, photographs, shutdown dates, and whether the cargo will sit, stuff the same day, or wait at a port. Preservation, blocking, crate or skid, marking and load-out follow that survey. Mixed lots are normal. A press, a panel and a compressor in one shutdown do not share one packing method.
Useful information for a quote: state and plant, equipment list, approximate sizes and weights, photographs, operational or shutdown status, destination, expected storage, and any customer packing specification. If fluids or permits sit in front of the pack, say so. That usually sets the start date.