Mass, centre of gravity and lift path
Heavy equipment crating fails when bases flex, lift points tear or free volume rips during ship motion. Survey mass, centre of gravity, lifting eyes, forklift pockets, residual fluids, loose covers and precision surfaces before any timber is cut. Document the lift plan. Do not invent lift points that the machine was not designed for. Do not bolt into sheet metal skins or cosmetic panels and call it structure.
Estimate dynamic factors for road, rail, vessel and terminal handling. A pack designed only for static floor mass will under-brace for ship motion. When centre of gravity is high or offset, bracing and base width must respond. When only one end may be forked, marks and pockets must force that behaviour. Unmarked heavy cases invite improvised lifts at terminals worldwide.