Shutdown survey through packing completion
The survey records equipment list, size and weight, lift points, transport position, residual fluids, photographs, shutdown dates, destination and expected storage. Axes and rams go to a stated transport position and are restrained. Identification tags go on before the first case closes if the line must rebuild in order. That work is scoped as factory relocation when sequence matters.
Preservation is selected after dwell and destination are known. Duration is project-dependent, and a sealed system is specified for the storage and transit the booking actually contains. Practical package limits are confirmed from the surveyed mass, centre of gravity, plant access, available lifting equipment and booked transport.
Load-out includes markings, any ISPM-15 timber marks required for the route, and a packing completion record: equipment list, photographs of the closed case, and tag register if used. Inland movement toward a port is part of the specification only when that haul is booked. BENZ executes that heavy machinery packaging as a turnkey job on the floor.
For a Pithampur or Indore shutdown, provide the estate, equipment register, photographs, residual-fluid and lockout status, destination, expected storage interval and movement window.