Survey through release record
Equipment list, size and weight, lift points, lock status, photographs, shutdown dates, destination and expected storage are recorded before preservation and structural design begin. Practical package limits are confirmed from the surveyed mass, centre of gravity, plant access, available lifting equipment and booked transport.
Deliverables at load-out typically include the equipment register, packing specification, photographs of the closed case, crate markings and a release record. If a line is moving hall to hall, tagging and sequence are scoped as factory relocation. BENZ executes that heavy machinery packaging as a turnkey job on the floor.
For a Neemrana or Jaipur movement, provide the estate, equipment register, photographs of tools or cabinets, transport-lock status, destination, expected storage interval and shutdown window.