Identify where the water is coming from
Look for wet cargo, recently exposed cartons, damp pallets and timber. Moisture held in these materials can move into the container air after loading. Record the conditions rather than relying only on the appearance of the cargo.
Also inspect roof, walls, door seals and floor. Repair or reject a leaking container before packing.
Prepare a dry load
Store cargo and packing materials under cover before loading. Keep pallets and cartons away from standing water. Where the product needs a controlled environment, specify its own sealed barrier pack and in-pack desiccant.
For metal goods, combine moisture control with a VCI material selected for the metals and packing process. VCI and desiccants perform different jobs within the protection system.
Install and record the protection
Select container units against the moisture load, route, season and exposure time. BE DRY ULTRA is BENZ’s calcium-chloride container family. Follow the supplied position and orientation instructions, keeping units clear of abrasion from the cargo.
- Record cargo and packing-material condition.
- Inspect container seals, floor and roof.
- Secure the specified desiccant quantity with airflow access.
- Photograph the load and installation before closing.
- Review arrival condition and humidity records for repeat shipments.
Questions from packaging buyers
Why does container rain happen during sea freight?
Temperature changes can cool the container surfaces below the dew point of the humid air inside. Water then condenses and may drip onto the cargo.
Can ventilation alone prevent container rain?
Ventilation performance depends on the container, cargo and outside climate. Select it as part of the route-specific packing plan alongside dry loading, cargo protection and moisture control.
Product data and practical guides
Request a packaging recommendation
Send the goods, pack or container dimensions, route and protection period. Include your work email and phone number for the technical documents.